Skip to main content

Post-Tension Installation

Post-Tension Cable Installation

Tendons placed per plan, profiles and sweeps set, reinforcing ready for concrete.

Request a BidCall 855-OLY-TIES

Post-tensioned slabs go up faster and thinner, but only if the tendons are placed right. Our crews place PT tendons per plan, support the cables at the correct heights and coordinate with your schedule.

Ironworker tying mild steel between post-tension tendons

Got drawings? Send them over.

We’ll get you a number fast. Or call 855-OLY-TIES.

Request a Bid